Comprehensive Bathroom Remodeling

Location: Jacksonville, FL Price: $12300 Duration: 2 weeks

A full bathroom rebuild: ceiling soffits removed, rotted shower framing replaced, marble tile, and a vanity and cabinet made for the room.

A light-toned tiled walk-in shower with rectangular wall tiles, hexagonal floor, a glass block window, and a corner bench.

Project Details

I did this bathroom myself, from demolition to the final coat. I removed the ceiling soffits to gain height and cut out the water-damaged, rotted framing in the shower area, then rebuilt it with moisture-resistant materials. Marble tile covers the floor and the walls, over waterproofing and a prepared surface. The bathtub was taken out and I built a reinforced frame for the new unit. I made and installed a vanity and a matching storage cabinet sized to the room, then painted and fitted the hardware.

Services Provided

tile installationcarpentercabinet maker

Similar Completed Projects